Process

You make the design choices. We handle everything else.

A fully managed delivery model built for busy office leaders. Six stages, written outputs at each one, and a single team accountable from the first call to the first Monday.

Network floor plans and equipment laid out on a project table

Six stages

What you do, what we do, what you get.

Your column is short on purpose. Everything else is ours to manage.

  1. 01

    Scope call

    You

    Tell us about your space, team and timeline.

    We

    We ask the questions that matter — headcount, room types, building, move date — and confirm what is in scope.

    Output — A written scope summary and next steps.

  2. 02

    Survey & discovery

    You

    Give us access to the space and any drawings.

    We

    We walk the site, review base-building infrastructure and existing equipment, and survey Wi-Fi and risers where needed.

    Output — Site findings, risks and constraints.

  3. 03

    Design & options

    You

    Choose between clear options — finishes for technology.

    We

    We design the network, cabling, Wi-Fi and AV, and present good / better / best options with plain-language trade-offs.

    Output — Design package, drawings and a fixed proposal.

  4. 04

    Procure & coordinate

    You

    Approve the design. That is the last big decision.

    We

    We order equipment and circuits, coordinate with your contractor, landlord and carriers, and pre-stage configurations.

    Output — Schedule, procurement tracker and weekly updates.

  5. 05

    Deploy & commission

    You

    Keep working. We stay out of the way.

    We

    We install, configure and test every drop, SSID, room and failover path — after hours in occupied spaces.

    Output — Test results and a commissioning sign-off.

  6. 06

    Handover & support

    You

    Walk in and start working.

    We

    We train your team, hand over documentation and keep monitoring after day one.

    Output — As-builts, runbook and an ongoing support plan.

Your decisions

The short list

  • Which room types you need, and how many
  • Display sizes and finishes that suit your interior design
  • How guests connect and what they can access
  • Good, better or best options where budgets matter

Our responsibility

Everything else

  • Site surveys, drawings and drop schedules
  • Carrier circuits and landlord approvals
  • Coordination with your general contractor
  • Procurement, licensing and warranties
  • Configuration, pre-staging and testing
  • Move-weekend cut-over and day-one support
  • As-built documentation and training
  • Monitoring and ongoing maintenance

Occupied or new

New build-outs and live offices.

In a new space, we work alongside your contractor so cabling, power and backing are planned before walls close.

In an occupied office, we phase the work, schedule disruptive tasks after hours, pre-stage equipment off site and keep a rollback plan for every cut-over — so your team keeps working while the infrastructure changes underneath them.

Start a project

Tell us about your space.

A short scoping form, a call with an engineer, and a clear proposal. You make the design choices — we handle everything else.